LINK ROAD
|
|
9.80 km of Link road to be constructed with expressway standard and 60 meter right of way |
|
|
Ensure optimisation of benefit from expressway by providing fast link to the city center |
|
|
It shall be connected by elevated corridor of 3.10 km length for access to Bangalore city center |
|
|
Reduction in travel time from downtown Bangalore city to Township no-1 to less than 15 minutes |
Elevated Link Road:
3.10 kilometers of elevated expressway connecting the Link Road to downtown Bangalore.

Link Road:
9.80 kilometers connecting the Bangalore-Mysore Expressway to state highway 17.
